Get a material take-off for the selected set

Material take-off on a set

A Revit partition type detail showing the layer build-up beside a table of stud sizes and ratings

Why it matters. A material take-off schedule is a second table, usually for the whole model. You wanted concrete in these walls, not the project.

What VI MCP does. Take-off on the found set. Changing a material’s colour is appearance. Compound-structure layers are the type build-up, not this take-off.

Try this prompt

“How much concrete is in these foundation walls, by material?”

Often next

Try it free for 30 days

Full functionality — no feature locks, no credit card. The trial starts automatically the first time the plugin connects.

From $1.99/month after the trial. See pricing