Material take-off on a set
Why it matters. A material take-off schedule is a second table, usually for the whole model. You wanted concrete in these walls, not the project.
What VI MCP does. Take-off on the found set. Changing a material’s colour is appearance. Compound-structure layers are the type build-up, not this take-off.
Try this prompt
“How much concrete is in these foundation walls, by material?”
Full functionality — no feature locks, no credit card. The trial starts automatically the first time the plugin connects.
From $1.99/month after the trial. See pricing